§ 15.12.010. Water and sewer charges, rates and fees.
Regular rates and charges for the furnishing of service shall be as set out in the following table. All rates subject to utility taxes.
Table 15.12.010
Thurston County Water and Sewer Utilities Rates and Charges in 2019 and 2020Monthly Charges Other Utility Fees and Services Utility/
ServiceNote
General Facilities
Charges per ERU
See Note 6Fixed Service
Charges per ERU
See Note 6Water
Consumption Rate
$ per 100 Cubic FeetInspection Fees
Section
ReferenceTemporary
Connection Fee
Hydrant Meter
Each Occurrence
See Note 10, 11Hydrant Meter Monthly Service Charge
See Note 11Service Fee
Each
Occurrence
Section
ReferenceYear
2019 2020 2019 2020 2019 2020 Tamoshan/Tamoshan/Beverly Beach Water 1,2 $76.17 $79.98 $2.54 $2.67 15.12.037 $160.00 $52.00 15.12.080 B.6 Sewer 1 $133.94 $140.64 15.12.037 Boston Harbor Water 1,4 See Section
15.12.041$34.14 $40.97 $2.56 $2.69 15.12.037 $160.00 $52.00 15.12.080
Note 6Sewer See Section
15.12.051$104.36 $109.58 15.12.037 Grand Mound Water 1,5 $2,771.42 $2,896.14 $42.59 $44.72 $2.44 $2.56 15.12.037 $160.00 $52.00 15.12.080 B.6 Sewer $3,617.43 $3,780.21 $87.76 $92.15 15.12.037 Woodland Creek Sewer See Section
15.09.270See Section
15.09.270Olympic View Sewer 1,3 $100.50 $105.53 Table 15.12.010 (Cont.)
Thurston County Water and Sewer Utilities Rates and Charges in 2019 and 2020
For Utility Services in Grand Mound Outside ULID No. 96-2Inside and Outside the ULID
Inside the UGA Boundary
Outside the UGA Boundary
Grand
Mound
Service
Latecomers
Agreement
Application Fee
Section
Reference
Service
Extension Charges
Section
ReferenceAdditional Capacity Charges Per E.R.U.
See Note 6 belowWater Rights Mitigation
Equivalent
Service Extension
Charges
Section
Reference
Additional Capacity Charges Per E.R.U.
See Note 6 below
Water Rights Mitigation
Water System Modeling Fee
Year
2019
2020
2019
2020
Water 1,5 15.12.037 15.12.025 $420.73 $439.66 Note 7
below15.12.035 $420.73 $439.66 Note 7
below$690.00 Sewer 15.12.037 15.12.025 $1,472.52 $1,538.78 N/A N/A Notes:
1. Properties in these utility areas are subject to utility local improvement district (ULID) property assessments. Assessments are paid separately to the county treasurer.
2. Tamoshan Division I, as recorded in Volume 18 of Plats, page 41, and within Tamoshan Division II, as recorded in Volume 19 of Plats, page 42, Thurston County, Washington.
3. Recorded in Volume 13 of Plats, page 46, and within Olympic View, First Addition, as recorded in Volume 14 of Plats, page 73, Thurston County, Washington.
4. Thurston County Utility Local Improvement District Nos. 1 and 2 and any other property connected to the Boston Harbor water system.
5. Thurston County Utility Local Improvement District No. 96-2 and any other property connected to the Grand Mound water and/or sewer system(s).
6. Equivalent residential unit (E.R.U) is defined in Section 15.12.012.
7. Valid water rights of a quantity adequate to support the planned development must be deeded to the county. See Section 15.10.210.
8. Not used.
9. Not used.
10. File application for service and pay non-refundable connection and hydrant meter set fees listed in Section 15.12.010.
11. Applicant for temporary water service for hydrant meters pay monthly service fee for operation and maintenance of hydrant and/or hydrant meter as listed in Section 15.12.010. Water usage shall be charged at the current rate per one hundred cubic feet of water.
12. Miscellaneous fees of thirty dollars for NSF checks.
(Ord. 13999 § 1, 2007: Ord. 13989 § 3 (part), 2007: Ord. 13697 § 1 (part), 2006: Ord. 13486 § 1, 2005: Ord. 13479 § 1 (part), 2005: Ord. 13441 Exh., 2005; Ord. 13278 § 1 (part), 2004: Ord. 13105 § 1, 2003: Ord. 12878 § 1 (part), 2002)
(Ord. No. 14156, § 3, 12-15-2008; Ord. No. 14318, § 4, 12-15-2009; Ord. No. 14446, § 6, 12-14-2010; Ord. No. 14688, § 1, 12-16-2011; Ord. No. 14749, § 5, 5-15-2012; Ord. No. 14815, § 1, 12-4-2012; Ord. No. 14959, § 1, 11-15-2013; Ord. No. 15212, § 1, 11-10-2015; Ord. No. 15411, 12-13-2016; Ord. No. 15524 , 10-2-2017; Ord. No. 15556 , 12-12-2017; Ord. No. 15695 , 12-11-2018)