§ 15.12.037. Plan review and inspection fees—Boston Harbor, Grand Mound and Tamoshan.
Proponents constructing sewer and water systems within the Boston Harbor, Grand Mound and or Tamoshan service area shall pay to the county the applicable fees identified on the approved fee schedules, which are adopted by reference.
Boston Harbor, Grand Mound and Tamoshan Water
and Sewer Plan Check and Inspection Fee Schedule
Commercial, Residential and SubdivisionService
Fee Schedule
Presubmission Conference $260.00 Plan Check Preliminary Review/Will Serve Letter $204.00 Water Plan Check $520.00 Sewer Plan Check $520.00 Preliminary Review and Plan Check Sub Total $1,504.00 Resubmittal $104.00 per hour Water Construction Inspections Preconstruction $185.00 Bedding and excavation $185.00 Main Tap $185.00 Pressure Test and Bacteriological Test $185.00 Final $185.00 Water Inspection Sub Total $925.00 Reinspection $74.00 per hour Sewer Construction Inspection Preconstruction $185.00 Bedding and excavation $185.00 Main Tap, Vacuum and S.T.E.P. Inspection $185.00 Vacuum Pit Inspections. This inspection is not required for gravity sewers. $185.00 minimum
plus $74.00 per hourFinal $185.00 Sewer Inspection Sub Total $555.00/$925.00 Reinspection $74.00 per hour Final Review and Process As Builts Plan Check $312.00 Financial Surety Posted $416.00 Bill of Sale $104.00 As Builts Mapping $208.00 Final Review Sub Total $1040.00 Re-inspection/Re-submittal Latecomer Application fee if applicable $74.00 per hour
$520.00 plus $104.00 per hour for every hour
in excess of five hours1.
Preliminary review and Will Serve Letter Fees are due to development services at application.
2.
Plan checks that require more than two, beginning with the third review; those hours will be billed at the hourly rate of $104.00.
3. The number of vacuum pits is determined by the number of residential units. Inspectors will charge an hourly rate for vacuum pit inspections. For example, it's estimated that it will take thirty minutes to inspect a vacuum pit. Therefore, eighteen vacuum pits at thirty minutes per inspection results in nine hours of inspection. At $74.00 per hour for nine hours the total vacuum pit inspection fee will be $667.00.
4.
Final review and processing fees are due when final plat is requested by the applicant.
Boston Harbor, Grand Mound and Tamoshan Water
and Sewer Plan Check and Inspection Fee Schedule
Residential and Individual ServiceService
Fee Schedule
Single Family Plan Review/Issue Certificate of Water Availability (COWA) $204.00 Water Connection/Inspection $148.00 Sewer Connection/Inspection $148.00 Reinspection $74.00 per hour 1.
Plan review and certificate fees are due to development services at applications.
2.
Inspection fees shall be billed during the monthly billing cycle by public works.
(Ord. 13989 § 3 (part), 2007: Ord. 13697 § 1 (part), 2006: Ord. 13479 § 1 (part), 2005: Ord. 13341 § 4, 2005)
(Ord. No. 14156, § 3, 12-15-2008; Ord. No. 14318, § 4, 12-15-2009; Ord. No. 15411, 12-13-2016)