§ 24.35.210. Frequently flooded areas—Drainage and erosion control plan.  


Latest version.
  • The applicant shall submit a drainage and erosion control plan which addresses methods to minimize erosion and contain soil within the project boundaries during construction and to provide for stormwater management from the site and its surroundings during and after construction, consistent with the Drainage Design and Erosion Control Manual for Thurston County, as amended (Chapter 15.05 TCC).

(Ord. No. 14773, § 3(Att. B), 7-24-2012)